Ban Pha Bong Key Points and Difficulties in the Processing and Fabrication of Steel Structure Spiral Stairs

Ban Pha Bong
1. 3D Space Modeling and Lofting
Ban Pha Bong
Ban Pha Bong - BIM Reverse Modeling: It is necessary to construct an accurate 3D model based on design parameters (rotation radius, tread angle, central column diameter). Use parametric modeling with BIM or Rhino + Grasshopper to verify the spatial geometric relationships and avoid interference between the tread plate, the central column and the handrail.
Ban Pha Bong
Ban Pha Bong - Segmented Lofting Strategy: Discretize the spiral line into multiple broken lines. Use a numerically controlled cutting machine to perform special-shaped cutting on the tread plate and the supporting beam, and mark the spatial positioning points (such as the welding coordinates of the tread plate and the central column).
2. Material Selection and Pretreatment
Ban Pha Bong
Ban Pha Bong - Main Structural Materials: For the central column, seamless steel pipes are preferably selected (such as Φ200×10mm Q345B). The tread plate is made of 8 - 12mm anti-slip checkered steel plate, and the handrail support is made of Φ50×3mm stainless steel pipe.
Ban Pha Bong
Ban Pha Bong - Anti-corrosion Pretreatment: For outdoor stairs, the steel needs to be sandblasted to remove rust (Sa2.5 level) and pre-coated with primer to avoid damage to the coating during subsequent welding.
Ban Pha Bong
Ban Pha Bong 3. Welding Deformation Control
Ban Pha Bong - Design of Workpiece Fixtures: Use an adjustable-angle circular welding fixture to fix the tread plate and the central column to ensure that the inclination angles of each tread plate are consistent (for example, each step rotates 10°).
Ban Pha Bong - Optimization of Welding Sequence: Adopt a symmetric skip welding process (such as welding the inner side weld first and then repairing the outer side weld), and control the interlayer temperature ≤ 150°C to reduce thermal deformation.
4. Assurance of Assembly Precision
Ban Pha Bong
- Virtual Pre-assembly: Obtain the actual dimensions of the components through a 3D scanner, simulate the assembly in the software, and then carry out physical assembly after correcting the errors.
Ban Pha Bong
- Setting of Positioning Reference: Take the plumb line of the central column as the reference, and use a total station to calibrate the three-dimensional coordinates of the end points of each tread plate (the error is controlled within ±2mm).
II. Technical Difficulties and Solutions
Ban Pha Bong
Ban Pha Bong 1. Cold Bending and Forming of Spatial Curved Beams
Ban Pha Bong
Ban Pha Bong - Difficulty: The spatial double curvature of the spiral handrail makes traditional roll forming difficult.
Ban Pha Bong - Solution: Adopt segmented cold bending (the length of each segment ≤ 1.5m) + use a numerically controlled pipe bender to precisely control the bending radius, and reserve a 2mm finishing allowance at the interface.
Ban Pha Bong
Ban Pha Bong 2. Structural Stability under Asymmetric Loads
Ban Pha Bong - Problem: The rotating staircase is prone to lateral torsion under eccentric loads.
Ban Pha Bong - Countermeasure: Pour C40 micro-expansive concrete (filling rate ≥ 90%) inside the central column, and at the same time, add triangular diagonal braces (such as L100×10 angle steel) at the cantilever end to form a spatial truss system.
Ban Pha Bong
Ban Pha Bong 3. Control of Tread Plate Flatness
- Challenge: Welding thermal deformation causes undulations on the surface of the tread plate (common error is 3 - 5mm).
Ban Pha Bong
- Process Improvement: Use CO₂ gas shielded welding (current 180 - 220A, voltage 24 - 28V), and use a hydraulic straightening machine to perform local flattening treatment on the tread plate after welding.
Ban Pha Bong
4. Transportation of Special-shaped Components and On-site Installation
Ban Pha Bong
Ban Pha Bong - Bottleneck: The overall spiral structure cannot be transported at one time and needs to be hoisted in sections.
Ban Pha Bong
Ban Pha Bong - Modular Design: Decompose the staircase into a central column module (for overall transportation), a tread module (with every 3 steps as a unit), and a handrail module. Use high-strength bolts (grade 10.9) for on-site connection, and inject structural adhesive at the joints for sealing.
Ban Pha Bong
III. Key Indicators for Quality Control
Ban Pha Bong
1. Dimensional Tolerance
Ban Pha Bong
Ban Pha Bong - The verticality deviation of the central column ≤ H/1000 (H is the total height)
Ban Pha Bong - The height difference between adjacent tread plates ≤ 3mm
Ban Pha Bong
- The straightness deviation of the handrail ≤ 2mm/m
2. Mechanical Properties
Ban Pha Bong - Static Load Test: Apply a load of 1.5kN/m², and the deflection ≤ L/250 (L is the span)
Ban Pha Bong
- Natural Frequency Detection: Avoid resonance with the human walking frequency (1.6 - 2.4Hz)
3. Durability
Ban Pha Bong
- The thickness of the hot-dip galvanized layer ≥ 85μm (outdoor environment)
Ban Pha Bong
Ban Pha Bong - The adhesion of fluorocarbon spraying ≥ 5MPa (tested by the cross-cut method)
IV. Application of Innovative Processes
Ban Pha Bong
1. 3D Printing of Positioning Molds: Use nylon materials to print the spatial positioning fixtures for the tread plate to improve the assembly efficiency.
2. Robot Welding: For repetitive weld seams (such as the connection between the tread plate and the central column), use a six-axis welding robot, and the weld penetration depth reaches more than 70% of the thickness of the base metal.
Ban Pha Bong
3. BIM + AR Technology: Overlay the 3D model onto the construction site through augmented reality devices to provide real-time guidance for the installation and positioning of complex nodes.
Ban Pha Bong Conclusion
Ban Pha Bong
The processing of steel structure spiral stairs is essentially a combination of precision machinery manufacturing and architectural art. It is necessary to achieve the quality objectives through digital modeling, process innovation and strict process control. It is recommended to carry out 1:1 local entity prefabrication at the initial stage of the project, and then start mass production after verifying the process feasibility.